Completed

Recently Finished

Complete

Jet-A Fuel System

A new Jet-A fuel system serving turbine aircraft and corporate operators at KMZZ.

Total cost$935,087
FAA grant (95%)$883,737
FundingFAA, INDOT, local
Complete

100LL Fuel System

A new 12,000-gallon 100LL avgas system, including 24/7 self-serve. Not eligible for federal funds, so it was paid for locally.

Total cost$821,929
FundingLocal
Complete

Parallel Taxiway Design

Engineering and design for a partial parallel taxiway toward Runway 33, now funded for construction.

Total cost$163,500
FAA grant (90%)$147,150
Under Way

Funded & Coming Next

Construction 2027

Partial Parallel Taxiway, Runway 33

Construction of a partial parallel taxiway toward Runway 33. Contracts are signed, and construction is set to begin in spring 2027.

Project cost$962,460
FAA grant (95%)$914,337
ContractorBrooks Construction
StartSpring 2027
Construction 2027

4-Unit T-Hangar Expansion

Four new T-hangar units for based aircraft. The construction contract is signed, and permit plans are being prepared.

Project cost$862,066
Federal (IIJA) grant$428,263
ContractorStrebig
StartLate 2027
Looking Ahead

Five-Year Capital Plan

Projects the airport has submitted to the FAA for future funding. Years and costs are estimates and depend on grant awards.

2027Parallel taxiway, phase 2 (paving and lighting)
2028Runway lighting rehabilitation
2029Runway 4 and Taxiway A rehabilitation (design)
2030Runway 4 and Taxiway A rehabilitation (construction)
2032Airport Master Plan update and wildlife hazard study